Safety and Efficiency

are the bigger savings

Full Span Box Girders formwork for precast concrete is mainly applied in railway construction. Catering length variations, HUAN YU’s Box Girder form is designed with fully hydraulic for opening/closing with a remote control. Corresponding to respective types and sequence, the operator carry out the PLC programming, which allows the sensor to transmit the feedback of the formwork working status and to execute the opening/closing action at the appointed position of the formwork.

Our Box Girder formwork has been popular worldwide: Jakarta-Bandung High-Speed Railway, the first HSR railway in the South Asia; MAHSR, the first bullet train project in India, etc. Currently, we are supplying the 80M Box Girder formwork to the Hangzhou Bay Cross-Sea Bridge.

View all our recent projects

Quality is the starting point

Technology

Accuracy is based on thorough calculation. We are working with social responsibilities.

Advanced equipments

Our workshop is fully equipped with industrialized machines.

Standardized procurement

Our suppliers have been chosen through rigid inspections.

Product characteristics

Segment shape system for box girders

This segments shape system consists of external mold, side molds, bottom mold, bulkhead molds and inner mold. The system is convertible between 32M and 24M.

  • The external mold is designed in modular, which means each plate is light enough to be assemble easily and conveniently.

  • The universal structure design of bottom mold can realize the conversion of the 32M to 24M segments, that is not only money-saving but a efficient working approach solution.

  • For the bulkhead mold, the basin stretching hold is rolled precisely by special tooling, ensuring the angle of the anchor bolt seat is perpendicular to the stretching direction of the steel hinges.

  • The inner mold is designed in sliding in and out of the whole formwork system by self-propelling mechanism. This solution saves the occupation of other accessory equipment, such as gantry cranes, facilitating the overall project progressing process.

Inner mold characteristics

Automatic operation system

  • Direct retraction of the variable diameter section
  • Automatic shifting system

  • Hydraulic remote control operation

Operation efficiency

  • Only 62 screw struts in the inner mold.

  • It takes 45 minutes for assemble.
  • The removal of the shapes takes 80 minutes ONLY.

Zero deformation

  • Beret-style inner mold: this fashion of structure reduces the structural deformation to zero during the craning process.

Convenient maintenance

  • Optimized hydraulic system: providing powerful function with lesser pipes, lower malfunction rate with noise reduction.

Projects of formwork system for box girders

Complete production lines.

Designing and fabricating in one place!

Product information for exportation:

  • Product name: Steel formwork system for box girders

  • HS Code: 84806000

  • Certificate of Origin: P.R. China

  • Method of shipment: 40 HQ container

  • Logistic services: according to customer’s requirements.

85 professionals from graduates to senior engineers.

Our design team is big enough to have the age diversity advantage. While experiences safeguard our professional sense, knowledge calculates the precision of the structures.

Bespoke industrial design
Digital manufacturing
Quality inspection
Logistic services

Contact us for more product information