Safety and Efficiency

are the bigger savings

From segment formwork system design to fabrication & assembly, HUAN YU offers all-rounded products and services.

Though originated from France, the technology of U Girder application has been adopted, developed, and matured in China. HUAN YU is one of the best steel formwork systems manufacturers for U Girders in China. Our formwork systems for U Girders have been serving all major projects for urban rail transit, Metro, viaducts, etc.

View all our recent projects

Quality is the starting point

Technology

Accuracy is based on thorough calculation. We are working with social responsibilities.

Advanced equipments

Our workshop is fully equipped with industrialized machines.

Standardized procurement

Our suppliers have been chosen through rigid inspections.

Product characteristics

Steel Formwork System for U Girders

U Girder is the recent girder type applied in urban rail transit elevated lines. The production and construction process of U girders is relatively advanced and novel, and the comprehensive performance has obvious advantages over ordinary box girders.  Its characteristics/advantages lie in building height reduction, noise reduction, and high utilization rate of cross-sectional space. It provides driving safety and beautiful appearance that enhances overall aesthetics. 

  • Overall design configuration of force-resisting.

  • Applying hydraulic systems to control the movement of the inner mould, providing higher efficiency and lower man-power consumption.

  • Efficiency and convenience of the removal of the side shutterings.

  • The inner mold is designed in sliding in and out of the whole formwork system by self-propelling mechanism. This solution saves the occupation of other accessory equipment, such as gantry cranes, facilitating the overall project progressing process.

Inner mold characteristics

Automatic operation system

  • Direct retraction of the variable diameter section
  • Automatic shifting system

  • Hydraulic remote control operation

Operation efficiency

  • Only 62 screw struts in the inner mold.

  • It takes 45 minutes for assemble.
  • The removal of the shapes takes 80 minutes ONLY.

Zero deformation

  • Beret-style inner mold: this fashion of structure reduces the structural deformation to zero during the craning process.

Convenient maintenance

  • Optimized hydraulic system: providing powerful function with lesser pipes, lower malfunction rate with noise reduction.

Projects of formwork system for box girders

Complete production lines.

Designing and fabricating in one place!

Product information for exportation:

  • Product name: Steel formwork system for box girders

  • HS Code: 84806000

  • Certificate of Origin: P.R. China

  • Method of shipment: 40 HQ container

  • Logistic services: according to customer’s requirements.

85 professionals from graduates to senior engineers.

Our design team is big enough to have the age diversity advantage. While experiences safeguard our professional sense, knowledge calculates the precision of the structures.

Bespoke industrial design
Digital manufacturing
Quality inspection
Logistic services

Contact us for more product information