Proudly, our segment shapes have been serving the first high speed railways construction in India since its very beginning. We take the following orders in accordance with the project development. HUAN YU moulds’ quality has been highly appreciated by the contractor Larsen & Toubro Ltd.

Casting yard visit RVS

Mumbai-Ahmedabad HSR Corridor

HUAN YU’s segments shapes has been serving Larson & Toubro Ltd (L & T). since the very beginning of project in 2019 up to dates. Mumbai-Ahmedabad High Speed Rail corridor is the first proposed Bullet Train project in India. Out of 352 km, L & T is executing 325 km length, which was separated in two packages. In order to expedite the construction of viaducts, NHSRCL is adopting a full span launching method by deploying 40 meters span box girder.  Contributing to the project’s construction cycle time and technological innovation, HUAN YU has been the awarded supplier for hydraulic operated prefabricated moulds for the 40 meters full span box girder, moulds for segmental girders and moulds for the piers.

It is the heaviest PSC (pre-stressed concrete) box girder in the construction industry of India: the 40 meters full span box girder weighs about 970 million tons, involving 390 cubic meters of of concretes and 42 tons of steel was cast in a single piece without any construction joint. In addition of the 40 meters full span girders, there are span girders of 30 and 35 meters as well. Our moulds produces girders of high level precision that meets up all technical procedure requirement.

The very first 40 meters full span girder was placed between the Pier P11 and P12 of the high-speed corridor. The height of the piers is 13.4 meters from the ground level.

Besides professional services on segment shapes application, HUAN YU, who has participated more than 600 projects worldwide, provides sourcing, casting etc. any added value assistance whenever is needed by our customers.

Project Details

DATE

2019-present

CLIENT

National High-Speed Rail Corporation Limited (NHSRCL)

PROJECT TYPE

Supplying hydraulic operated segment shapes for box girders,  pier, and pier cap.